Posted On: January 10, 2024
Wirtgen’s new W 220 XFi milling machine is a large, tracked model with assistive technologies to lower carbon emissions and operating costs while making the operator’s job easier. ...
Posted On: November 21, 2023
The Wirtgen WRC 240(i) rock crusher can crush, process, and homogenise materials such as coarse rocks and stone, concrete fragments, and hand-packed Telford base layers in situ in a continuous process. ...
Posted On: December 9, 2022
The new comfort cabin option for the manufacturer’s cold planers isolates the operator not only from the weather, but also from the noise of the milling drum and diesel engine. ...
Posted On: October 27, 2022
The bike path, with a width of less than 2 metres, lay on a narrow verge alongside a roadway and was a great fit for the cold planer’s 1-metre-wide milling drum. ...
Posted On: June 24, 2022
The new newest Wirtgen machine extracts raw materials, then crushes them in situ before offloading them via conveyor. ...
Posted On: January 27, 2022
The WPS 102i and SP 94i were presented as part of a concrete paving train along with a TCM 180i texture curing machine. ...
Posted On: May 14, 2021
Authorities in Monsanto, Portugal, estimated that repairs of ER 361 would take about 12 weeks, but thanks to cold recycling, the job was done in just four days plus 20 hours of construction time. ...
Wirtgen’s KMA 240(i) Cold Recycling Plant Economically & Ecologically Handles German Airport Project
Posted On: April 30, 2021
Using precise microprocessor control, the Wirtgen plant can produce cement-treated base layers (CTBs), roller-compacted concrete (RCC), and bituminous-bound base layers with cement, bitumen emulsion, or foamed bitumen. ...
Posted On: January 21, 2021
The site, measuring more than 80,000 square metres in area, had cohesive soil that needed to be stabilised and consolidated with a lime-cement mixture in order to support the new buildings of the industrial park. ...
Posted On: October 14, 2020
The intrepid crew began milling the road at 10 p.m. on a Friday and completed the application of road markings and other follow-up tasks by 5 a.m. on Monday. ...
Posted On: June 23, 2020
The machine achieved a production output of nearly three times the target and proved itself well-suited for working in muddy, wet terrain and on gradients up to 16%. ...
Posted On: April 3, 2020
The new machines come with powerful, efficient engines, as well as Wirtgen’s Mill Assist and Wirtgen Performance Tracker features as standard. ...